Water Treatment Plant

Product Image (07)

Effluent Treatment Water Plant

  • Delivery Time:4-6 Week
  • Supply Ability:10 Per Month
  • Material:MS,SS,FRP, civil
  • Power Consumption:5 KW to plant capacity Kilowatt (kW)
  • Voltage:5 to 100 Watt (w)
  • Drive Type:Electric
  • Water Source:Other
  • Recycle Rate:60 to 90 % reuse
  • Product Type:ETP
  • Feature:smooth,silent,low maintanance
Product Image (08)

Sewage Water Treatment Plant

Price: 3 lakh and above INR/Unit

For hotel, commercial , industrial and housing, sewage treatment plant.

Product Image (33)

Drinking Water Treatment Plant

Price: 01 INR/Set
  • Supply Ability:10 Per Month
  • Delivery Time:8-12 Week
  • Power Consumption:05 Kilowatt (kW)
  • Material:SS ,FRP, PVC
  • Water Source:Well Water
  • Voltage:5000 Watt (w)
  • Drive Type:Electric
  • Automatic Grade:Semi Automatic
  • Feature:smooth, silent and low maintanance
  • Purity Level:Ultra pure
X


Back to top
VAS ENTERPRISE All Rights Reserved.(Terms of Use)
Developed and Managed by Infocom Network Ltd.